Bornhorst + Ward – Engineering the shape of Queensland

Posted Posted in News

Construction on a massive wall that will require enough concrete to fill an Olympic-sized pool has commenced at the much-anticipated $3.9 billion Queens Wharf project in Brisbane.Described as a “engineering feat”, the 172 metre concrete wall will create an underground barrier between the wharf and the Brisbane River.Known as the “diaphragm wall”, the barrier will […]

BILT ANZ Conference 2018

Posted Posted in News

The Annual BILT ANZ conference was held in Brisbane last week with over 500 attendees. Andrew Bryant, one of Bornhorst + Wards Associates was invited to speak and share his knowledge on customised Precast Detailing with Revit, and to give some insight into the Aptus/ DRM Concrete Connections system. Andrew has been leading a team […]